Modular Solutions, Engineering & Contracting

ELECTRICAL SUBSTATION AND CONTROL ROOM FOR MULTYPHASE PUMPS BORNEMANN 2200 KW

Details

Client: Bonatti
location: Algeria
Period: from April 2017 to March 2018
Enclosure type: LER
End user: N.7 PRC Size (W x L x H) 6000 x 3000 x 3000 mm
N.7 CRC Size (W x L x H) 12000 x 3000 x 3800 mm
N.7 ERC Size (W x L x H) 12000 x 3000 x 3800 mm
E-House:
  • Sandwich panel type
  • Floating flow
  • Steel code: ASTM
Fire Fighting System:
  • Heat, smoke and gas detectors complete of fire alarm control panel
Auxiliary systems:
  • Lighting, sockets, lightning, earthing
HVAC:
  • 2x100% (units safe area) 6/15/100 kW
  • Duct System, HVAC control panel
  • Air pressurization
Main equipment:
  • Variable Frequency Driver (VFD)
  • Power center and motor control center
  • Programmable Logic Control (PLC)
  • UPS
Address

D-Energy S.r.l.

Via Ferdinando Magellano, 2
I-20090 Cesano Boscone (MI)

Contacts

Phone +39 02 45058564

info@d-energy.it

Company info

REA registration number
MI-2066288
Vat Number IT09063610969
Paid-up capital 300,000.00 €

This site does not use profiling cookies or other online profiling tools (eg: customer identification codes) in order to send personalized advertising messages.
Privacy & Cookie Policy © 2021 D-Energy S.r.l. - All right reserved.