Modular Solutions, Engineering & Contracting

GAS CAPACITY INCREASE PROJECT (GCIP)

Details

Client: Bonatti
location: Algeria
Period: from November 2018 until to June 2019
Building type: Local Equipment Room (LER) / Local Instrument Room (LIR)
Building size: No. 1 module, size18.000 x 3.600 x 4.100 mm
No. 1 module, size 20.000 x 3.600 x 4.100 mm
End user: PERTAMINA
   

Scope of work

   
E-House:
  • Full Welding Type
  • Steel code: ASTM
  • Access floor, false floor, platform and ladders
  • Battery room with Eex-d system
Fire & Gas System:
  • Heat, smoke and gas detectors complete of fire alarm control panel
  • NOVEC firefighting system
Auxiliary systems: Lighting, sockets, lightning, earthing
HVAC:
  • 2x100% (units safe area) 60 kW
  • Duct System, HVAC control panel
  • Air pressurization
Main equipment:
  • Telecom and PLC cabinet
  • MV/LV power transformer
  • Low voltage switchboard
  • UPS
Address

D-Energy S.r.l.

Via Ferdinando Magellano, 2
I-20090 Cesano Boscone (MI)

Contacts

Phone +39 02 45058564

info@d-energy.it

Company info

REA registration number
MI-2066288
Vat Number IT09063610969
Paid-up capital 300,000.00 €

This site does not use profiling cookies or other online profiling tools (eg: customer identification codes) in order to send personalized advertising messages.
Privacy & Cookie Policy © 2021 D-Energy S.r.l. - All right reserved.